You have reached your limit of 3 free stories. A story preview is shown instead.
To view more stories
(If your subscription is current,
click here to Login or Register.)
Allis-Chalmers Ripper Mounted On 3-Pt.
Leonard Seltzer updated his old Allis-Chalmers snap coupler subsoiler with 3-pt. mounts. He also added an eye bolt to make the attachment easy to move.
“I wanted to tear up some headlands that had gotten compacted, but I wanted to mount the ripper on the 3-pt. on my International Hydro 84,” says Seltzer. “I cut
..........
You must sign in, subscribe or renew to see the page.

You must sign in, subscribe or renew to see the flip-book
Allis-Chalmers Ripper Mounted On 3-Pt SUBSOILERS Leonard Seltzer updated his old Allis-Chalmers snap coupler subsoiler with 3-pt mounts He also added an eye bolt to make the attachment easy to move “I wanted to tear up some headlands that had gotten compacted but I wanted to mount the ripper on the 3-pt on my International Hydro 84 ” says Seltzer “I cut off the snap coupler mount and after measuring some 3-pt mounts I fabricated one for the subsoiler ” The subsoiler frame consisted of a pair of steel bars that sandwiched the beam of the curved ripper tooth and came forward to the snap coupler Seltzer ran a piece of rectangular tubing across the forward end of them He welded short steel plates to the ends of the crossbar and drilled holes in the plates for the lift arm pins The top link connector was made with two 3/8 by 4-in pieces of scrap iron Two 3/8 by 3-in steel supports were mounted vertically between the top link connector and the lower link crossbar “The top link is lighter as it doesn’t have that much stress ” says Seltzer “I reinforced the crossbar which gets terrible stress by running pairs of 3/4-in rebar from either end of the crossbar back to the joining of the frame and the ripper tooth beam Since the ripper pulls from the center these equalize the pressure to each 3-pt arm ” Adding the 3-pt made the subsoiler top-heavy and awkward to move around Seltzer added a forged 5/8-in eyebolt to the balance point of the frame to make it easier to move “I used it on the headlands and also to rip through a pothole about an acre in size ” says Seltzer “It gets about a foot and a half deep and opened up the ground to let the water through ” Seltzer is unsure just how old the subsoiler is A local machinery dealer who once carried Allis-Chalmers suggested it dates back to the 1950’s Contact: FARM SHOW Followup Leonard Seltzer 16040 Manhattan Rd Manhattan Ill 60442 ph 779-279-5116
To read the rest of this story, download this issue below or click
here to register with your account number.