How To Save Money When Graveling A Road
Darol Dickinson got tired of paying for road gravel that he didn’t need. So he came up with a simple idea that lets dump trucks spread gravel only over vehicles’ tire tracks.
  “We operate a large ranch where the soil is prone to get muddy. We often put in new all-weather pasture roads, or resurface old ones,” says Dickinson. “Normally, the dump truck will lay an apron of gravel 3 in. thick across the width of the road. It costs about $200 to gravel 200 ft. of road so the cost really adds up in a hurry. We needed a way to reduce the cost.”
  His solution is to lay a 6-in. sq, 4-ft. long wood block in the center of the truck’s inside dump gate when the truck is empty. The truck driver opens the gate 1 in. high to let gravel out, but the block limits the release of gravel to two 18-in. wide streams on either side of the gate where the wheels track. The two 18-in. wide streams of gravel are about the width of a set of duallies on a pickup.
  “The 4-ft. wide section in the middle of the road doesn’t get any gravel. As a result, a truck with an 8 1/2-ft. wide bed can go twice as far before it runs out of gravel. It saves a lot of money,” says Dickinson.
  Contact: FARM SHOW Followup, Darol Dickinson, 35000 Muskrat, Barnesville, Ohio 43713 (ph 740 758-5050; darol@texaslonghorn.com).


  Click here to download page story appeared in.



To read the rest of this story, download this issue below or click here to register with your account number.
Order the Issue Containing This Story
2011 - Volume #BFS, Issue #11